Advanced High Cost Performance Multiple Hearth Furnace Continuous Active Carbon Regeneration System

Product Details
Customization: Available
After-sales Service: 24 Hours for Your Service
Warranty: 12 Months After Stable Running

360° Virtual Tour

Diamond Member Since 2022

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
52
Year of Establishment
2019-12-30
  • Advanced High Cost Performance Multiple Hearth Furnace Continuous Active Carbon Regeneration System
  • Advanced High Cost Performance Multiple Hearth Furnace Continuous Active Carbon Regeneration System
  • Advanced High Cost Performance Multiple Hearth Furnace Continuous Active Carbon Regeneration System
  • Advanced High Cost Performance Multiple Hearth Furnace Continuous Active Carbon Regeneration System
  • Advanced High Cost Performance Multiple Hearth Furnace Continuous Active Carbon Regeneration System
  • Advanced High Cost Performance Multiple Hearth Furnace Continuous Active Carbon Regeneration System
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Recommend Products
  • Company Profile
  • Our customers
  • Certifications
  • Why Choose Us
  • Services
Overview

Basic Info.

Model NO.
YUAN-ACR-Q
Advantage
Low Consumption
Manufacturing Time
2023
Condition
New
Quality
Top Level
Automatic Level
Automatic Control
Main Material
SS304
Power
Depends on The Capacity
Voltage
318V / 220V / Customized
Capacity
Customized
Delivery Time
3-6 Months
Installation Time
1-2 Months
Transportation
by Sea
Weight
Depends on Capacity
Dimention
Depends on Capacity
Construction Area
Depends on Capacity
Transport Package
Seaworthy Package
Specification
Customized
Trademark
YUAN
Origin
China
Production Capacity
100 Sets Per Year

Product Description

Product Description

Equipment Principle
It is specially designed for the repeated use of granular active carbon in the adsorption system.

Product Feature
* The regeneration furnace reuses the waste active carbon which protect the environment and utilize the resources reasonably.
* The regeneration furnace can accurately control the activation depth, continuous feeding and discharge. Uniform and reliable product quality.
* The furnace body is strong in structure and can be used continuously for many years.
* The regeneration furnace can realize full automatic control, high efficiency and safety.
* High automatic control level which is conducive to the construction and transformation of intelligent workshop.
* Simple and economical maintenance and low average running cost.
* Our team has rich experience in design, technology support, installation & commissioning at site and perfect after-sales service.
* Customized services, turnkey project, etc. are available for different customers.

Industry Application
* Active carbon activation and regeneration, includes:
(1) Glucose industries: starch glucose like maltose, glucose, maltodextrin, crystalline dextrose, fructose, F42, F55, crystalline fructose, etc. Xylose.
(2) Chemical industries: organic acids, including L-lactic acid, citric acid, VC, MSG and various amino acids, like lysine, L-phenylalanine, leucine, methionine, etc.
(3) Food industries: s
tevia, sorbitol, xylitol and other sweetners, antioxidant Iso VC sodium, etc.

(4) Pharmaceutical industries: antibiotics, etc.
(5) Thermoelectric industries: water treatment, etc.
* Treatment of incineration tail gas, heat energy recovery project
* Calcination of kaolin
* Roasting of non-ferrous metals (such as molybdenum, nickel, copper, zinc, etc.)
* Incineration of industry hazards (solid, liquid and gas), such as sludge from sewage treatment plant

Detailed Photos

 

Advanced High Cost Performance Multiple Hearth Furnace Continuous Active Carbon Regeneration System
Advanced High Cost Performance Multiple Hearth Furnace Continuous Active Carbon Regeneration System
Advanced High Cost Performance Multiple Hearth Furnace Continuous Active Carbon Regeneration System
Advanced High Cost Performance Multiple Hearth Furnace Continuous Active Carbon Regeneration System
Country of Origin China
Automatic Level Automatic Control
Main Material SS304
Voltage 318V / 220V / Customized
Delivery Time 3-6 Months
Installation Time 1-2 Months
Transportation by Sea
 
Recommend Products

Advanced High Cost Performance Multiple Hearth Furnace Continuous Active Carbon Regeneration System

Company Profile

Advanced High Cost Performance Multiple Hearth Furnace Continuous Active Carbon Regeneration SystemAdvanced High Cost Performance Multiple Hearth Furnace Continuous Active Carbon Regeneration System

Our customers

Advanced High Cost Performance Multiple Hearth Furnace Continuous Active Carbon Regeneration System

Certifications
Advanced High Cost Performance Multiple Hearth Furnace Continuous Active Carbon Regeneration System

 

Why Choose Us

Advanced High Cost Performance Multiple Hearth Furnace Continuous Active Carbon Regeneration System

 

Services

1.Pre-sale service
sales engineers with professional technical background will provide you with product introduction, process consultation, support of related technical materials and other services. By the experts, professional engineers for you to solve the process, the design and calculation of performance parameters, complete sets of equipment optimization configuration scheme, equipment selection and other services.
2.On-sale service
one-to-one service is provided by the project manager which includes the whole process of ordering, technical contract, design, manufacturing, quality inspection, packaging and transportation, installation and commissioning, operation training, etc.
3.After-sale service
provide you with relevant product information, file your product construction information, regularly make customer visits, but also provide you with products vulnerable to consumption parts, technical consultation, technical transformation and upgrade services in the use process.
4.Field Service
After the equipment arrives at the site, we will send experienced engineering and technical personnel or construction personnel to the site for technical supervision of installation, commissioning and operator training, and responsible for solving the manufacturing quality problems found in the installation, commissioning and trial operation of the contract equipment.
5.Respond Promptly
When the user requests for on-site service, we will reply within 24 hours after receiving the notice, and arrive at the site with the fastest speed.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier